Project Acceptance
The two-stage acceptance system is implemented as follows:
Two-stage acceptance system
├─ Completion acceptance
│ ├─ Visual inspection of documents, drawings and the plant building — Design requirement confirmation
│ ├─ System visual inspection ─────────────────┐
│ ├─ Trial operation of individual units and systems ──┼─ Installation qualification
│ ├─ Filter leak test (completed by the contractor) ───┘
│ └─ Adjustment testing (completed by the contractor) — Operational qualification
└─ Comprehensive performance evaluation — Performance inspection by a third party — Performance qualification